K12 Schools

Safe, Modern, Equitable: Bond County's Master Plan Delivered

This $12 million comprehensive modernization program delivered Bond County’s Master Plan and vision, addressing immediate needs and strategic initiatives so they are prepared for the future.

GRP|WEGMAN Makes Bond County CUSD #2's  
Master Plan a Reality

Bond County Community Unit School District #2 selected GRP|WEGMAN to help them address their Master Plan of keeping "Safe and Equitable Education for All Students, Staff, and the Community." We were thrilled to serve as construction manager - and as architect and engineer for large scopes of the project - to bring their vision to reality for students, staff, and the Bond County community.

One of the centerpiece projects in our strategic plan for the district was a $4.3 million gymnasium addition where we served as construction manager, architect, and engineer. This allows for an additional gymnasium for all students to us both during school and after school activities, as well as expanding their cafeteria and adding ADA Restrooms.

GRP|WEGMAN transformed a veterinarian building into an Early Childhood Center, meeting State/Federal requirements. We renovated the space and completed a full roofing replacement, comprehensive window replacement, LED lighting retrofit, new flooring installation, HVAC system upgrades, new sidewalk networks, and expanded parking lot construction.

We delivered strategic additions to the elementary school, building an administrative building completed in 2023, creating modern office spaces including expanded principal's office suite, new counselor offices designed for student services, and enhanced administrative areas. A new library was also constructed that enables ADA access. This was a key component for the strategic planning in keeping a safe and secure learning environment.

GRP|WEGMAN executed a comprehensive renovation of Pocahontas Elementary School, encompassing demolition, asbestos abatement, and classroom reconstruction featuring upgraded flooring, ceiling systems, and LED lighting technology. The project included replacement of nearly all HVAC infrastructure, complete roofing systems, and installation of code-compliant gymnasium bleachers. This $2.35 million initiative aligned with the community's strategic long-term development plan.

GRP|WEGMAN performed HVAC replacement and control upgrades District-wide including new high-efficiency HVAC units, new central heating and cooling plants, as well as a control system to monitor usage to optimize energy consumption.

"Bond County CUSD #2 Administration, Board of Education, Community and Families decided to take action on our vision of a “Safe and Equitable education for all our students, staff, and the community.  

By partnering with GRP|WEGMAN, we turned our vision into reality. Through decisive implementation, strategic planning, and execution, we improved the student experience. It’s been a great partnership for the past 13 years."

Dr. Wes Olson

Superintendent, Bond County CUSD #2
Multi-Phase Renovation
New Construction
Design-Build
Project Type
Energy Savings Performance Contracting
& Construction Management
Method
$12
Million
Project Cost
Ongoing
Partnership
Status

Let's Build The BEST 
SOLUTION TODAY

Where we do our best work

Renewable Energy

Our expert engineers, project managers, and technicians are prepared to deliver tailor-made microgrid, solar, geothermal, and battery storage projects from concept to completion, ensuring a seamless, efficient transition to renewable energy for you.

Design/Build

We manage both the design and construction phases of your project, streamlining communication, reducing costs, and ensuring a cohesive, efficient process from concept to completion.

Facility & Energy Performance

We are an Innovative Facility & Energy Solutions company specializing in design build, energy-efficient renovations for any type of government, school, college, university, non-profit, commercial or industrial building.

Facility Services

We provide preventative maintenance for industrial and commercial buildings, keeping them operating at top capacity. Whether it’s Electric, Plumbing or HVAC/R needs, we look at the big picture, solve your problem at its core and offer preventative care.

Water & WasteWater
Infrastructure

We deliver comprehensive water and wastewater infrastructure solutions focused on reducing water loss, optimizing energy use, and improving system performance. From advanced SCADA systems and energy-efficient technologies to accurate metering and methane capture for renewable energy, we provide sustainable, cost-effective services that enhance operational efficiency and ensure long-term infrastructure reliability.

Industrial

Whether it is maintenance, construction, or fabrication, we are your trusted partner for all industrial needs. Our team is built to handle complex piping systems, high pressure & temperature vessels, electrical systems, control systems, and other industrial equipment in a variety of applications.

Want more info?

Reach out to us!

Fill out this form and someone from our team will get back with you shortly!

Thank you! Your submission has been received! Somone from the GRP|WEGMAN team will reach out shortly.
Oops! Something went wrong while submitting the form.
All Content Copyright © 2024
GRP|WEGMAN




Illinois Shines Program Participants | [1] Results may vary. Project outcomes and savings depend on site-specific conditions and other factors. [2] Not all customers qualify for the Federal Investment Tax Credit (FITC). Please consult a tax professional to determine eligibility.