This project was comprised of a replacement of roofing, tuck-pointing, new windows, controls design, exterior doors, new HVAC system and controls system throughout sections of the building. This project began in January 2017 and was completed in the fall of 2017.
Annual Energy Savings: $3,422
Annual Operational Savings: $134,704.45
Contract: $2,762,529