Staunton CUSD #6

This project was comprised of a replacement of roofing, tuck-pointing, new windows, controls design, exterior doors, new HVAC system and controls system throughout sections of the building. This project began in January 2017 and was completed in the fall of 2017.

Annual Energy Savings: $3,422

Annual Operational Savings: $134,704.45

Contract: $2,762,529

Read Full Case Study

Before

After