St. Louis Zoo

St. Louis Zoo - Chiller Work

Scope: GRP performs preventive maintenance and repairs to various areas throughout the St. Louis Zoo campus such as: 125 ton chiller in the penguin and puffin house, 150 ton chiller in sea lion basin, and 75 ton chiller in polar bear basin.

Read Full Case Study

Before

After