Dixon Public Schools #170

This was a 2 Phase project comprised of replacing windows in entire building (Reagan Middle School).  New RTU’s with heat recovery were installed for cafeteria, band and chorus areas.  Lighting systems were upgraded to state of the art efficiency and included motion detection.

The scope of Phase 2 included replacement of all the original HVAC units with new high efficient systems.  A new control system was installed to control the entire building.  A restroom renovation in both boys’ and girls’ restrooms was completed with new flooring, ceiling, exhaust, fixtures and partitions.

Scope Phase 1:

Contract: $745,000

Annual Energy Savings: $18,658

Annual Operational Savings: $18,592

Grant: DCEO $78,416

 

Scope Phase 2:

Contract: $2,359,000

Annual Energy Savings: $34,098

Annual Operational Savings: $121,102

Grant: DCEO $85,005

Read Full Case Study